1. The east approach of the Bay Bridge looking from the CSX Railroad Bridge.
|
2. Aerial view of project taken on 11/27/07
|
3. The last concrete girder set on the Project at span 50 of the South Bridge.
|
4. Painting the substructure columns and caps.
|
5. Placing deck concrete on Spans 39 to 41 of the Eastbound Bridge.
|
6. 42 inch Texas barrier rail along the pedestrian walkway.
|
7. Aerial view of the remaining deck work to be completed on the Eastbound Bridge.
|
8. Deck reinforcing for the CSX Railroad Bridge.
|