001 All five haunch girders erected at pier 52 north
|
002 Lowering the first haunch girder into position at pier 52 north
|
003 View of construction looking east form the main span with existing bascule span to the left
|
004 View of construction looking west from the main span
|
005 Aerial view of project looking northeast from the Biloxi side
|
006 Installation of pile template at pier 9 of the south bridge
|
007 Loading one of the last barge loads of rubble from the low level portion to the existing bridge
|
008 Structural steel erected at spans five and six of the North CSX Railroad Bridge
|