1. Aerial view of project taken on 1/27/08 looking west.
|
2. Initial installation of the pedestrian rail at span 4.
|
3. Light pole installation beginning on the west end of the bridge.
|
4. Completed south bridge deck with light poles installed.
|
5. Structural steel girder painting at the CSX RR Bridge.
|
6. Placement of the 2nd lift of asphalt at the east approach of the Bay Bridge.
|
7. View of South Bay Bridge with lights and painting completed.
|
8. Break water constructed with concrete rubble from the existing bridge.
|