01 - Aerial photo of Main Span substructure construction and demolition of existing bridge
|
02 - Aerial photo of the west approach and west low level constuction incliuding bridge deck at spans 4-7
|
03 - Waterline view of cap and colunm construction at the Main Span
|
04 - Installation of the first 72 inch by 120' girder at spna 12 of the north bridge
|
05 - Erection of steel falsework at Pier 52 used to support Main Span girders during construction
|
06 - The first deck pour was placed with a pump truck from the bank
|
07 - Deck placement and finishing operations at Spans 6-7
|
08 - Placing boom and slick line used to place concrete on the deck
|