1. The last deck placement at Spans 49 and 50 of the South Bridge.
|
2. The final substantial concrete placement on the Bay Bridge.
|
3. Aerial photo looking west over the CSX Bridge.
|
4. The final section of 32 inch barrier rail being slip formed.
|
5. Construction channel reclamation operations on the east side.
|
6. Stripping deck overhang formwork between the two bridges at Span 53.
|
7. Aerial photo of the Bay Bridge looking east.
|
8. Placing 42 inch barrier rail on the South CSX Bridge.
|
9. View of Bay Bridge looking east from Biloxi.
|
10. Installation of South Bridge accent lights from overhang platforms.
|